[1]吴朝阳,吴红华,李正农,等.地铁临近既有基础情形施工研究综述[J].自然灾害学报,2009,(03):048-52.
 WU Zhao-yang,WU Hong-hua,LI Zheng-nong,et al.A summary of research on subway construction approaching existing foundations[J].,2009,(03):048-52.
点击复制

地铁临近既有基础情形施工研究综述
分享到:

《自然灾害学报》[ISSN:/CN:23-1324/X]

卷:
期数:
2009年03期
页码:
048-52
栏目:
出版日期:
1900-01-01

文章信息/Info

Title:
A summary of research on subway construction approaching existing foundations
作者:
吴朝阳1 吴红华1 李正农1 杨建山2
1. 湖南大学土木工程学院, 湖南 长沙 410082;
2. 长沙市轨道交通集团有限公司, 湖南 长沙 410011
Author(s):
WU Zhao-yang1 WU Hong-hua1 LI Zheng-nong1 YANG Jian-shan2
1. College of Civil Engineering of Hunan University, Changsha 410082, China;
2. Changsha Mass Transit Group Co., Ltd, Changsha 410011, China
关键词:
地铁基础离心机试验数值模拟
Keywords:
subwayfoundationcentrifuge experimentnumerical simulation
分类号:
U231+.3
摘要:
对地铁临近基础情形施工的主要研究途径有3种:原位测试、模型试验和理论分析。按上述分类,系统地总结了过去几十年来的主要研究成果,其中着重介绍了近年来国内外的数值模拟研究成果,并展望了该领域中值得进一步研究的方向。
Abstract:
There are three major approaches to research on subway construction near the existing foundations:in-situ expermients,model tests and theoretical analysis.In this paper,the main research results in the past dozens of years were reviewed systematically according to the above classification.Domestic and foreign research results of numerical smiulation in recent yearswere introduced emphatically.In addition,the valuable further research directions in this field were proposed at the end.

参考文献/References:

[1] Coutts D R,Wang J.Monitoring of reinforced concrete piles under hourizontal and vertical loads due to tunnelling[C]//Zhao,Shirlaw,Krishman.Tunnels and Underground Structures.Rotterdam:Balkema,2000:514-546.
[2] 刘晓苹,李坚.桥梁桩基受地铁盾构掘进影响的研究与探讨[J].上海公路,1998(3):20-24.
[3] Litwiniszyn J.Fundamental principles of themechanics of stochasticmedium[M].Proc.of 3 th Conf.Theo.Appl.Mech.,Bongalore,India:[s.n.],1957.
[4] Kmiura T,Mair R J.Centrifugaltesting of model tunnels in softclay[M].Proc.of 10th Int.Conf.Soil Mechanics& Foundation Engineering,Stockhoml:Balkema,1981.
[5] Toshi Nomoto,Shinichino Imamura et al.Shield tunnel const ruction in centrifuge[J].Journal of Geotechnica land Geoen viromental Engineering,1999:125(4):289.
[6] Kuwano J,Honda T,Takahashi A,et al.Centrifuge investigation on deformations around tunnels in nailed clay[J].Geotechnical Aspects of Underground Construcion in Soft Ground,Tokyo,1999:245-250.
[7] Grant R J,Taylor R N.Tunnelling-induced ground movements in chay[J].Proc.Instn Civ.Engrs Geotech.Engng,2000(1):43-55.
[8] Loganathan N,Poulos H G,Stewart D P.Centrifuge model testing of tunnelling induced ground and pile deform ations[J].Geotechnique,2000,50(3):283-294.
[9] 韩立忠.地铁越江隧道地基沉降的离心模型试验分析[J].地下工程与隧道,2005(3):13-15.
[10] 马亮,高波.隧道施工地表沉降控制的离心模型试验[J].施工技术,2005,34(6):6-8.
[11] Peck R B.Deep excavations and tunnelling in soft ground[C]//Proc.7 th Int.Conf.on Soil Mechaniecs and Foundation Engineering,Mexico City,1969:225-290.
[12] Muir wood A M.The circular tunnel in elastic ground.Geotechnique[J].1975,25(1):115-127.
[13] Verruijt A,Booker J R.Surface settlement due to defomration of atunnel in an elastic half plane[J].Geotechnique,1999,46(4):751-756.
[14] Lee K M,Rowe R K.Finite Element Modelling of Three-Dmiensional Groand Defomrations Due to Tnnnelling In Soft Cohesive Soils[M].Toronto:[s.n.],1990.
[15] Ezzeldine O Y.Estimation of the surfacedisp lacement field due to contruction of Cairo Metro Line EIK halafawy-St.[J].Tunneling and underground space technology,1999,14(3):267-279.
[16] Swoboda G,Abu-Krisha A.Three-dmiensional numerical modeling for TBM tunneling in con so lidated clay[J].Tunneling and underground space technology,1999,14(3):327-333.
[17] Mroueh H,shahr0ur I.Three-dimensional finite element analys is of the in teraction bewteen tunneling and pile foundations[J].In ternat ional Journal for Numerical and Analytical Methods in Geomechanics,2002,26(3):217-230.
[18] Pang C H,Yong K Y,Chow Y K.Three-dimensional numerical smiulation of tunnel advan cementon adjacent pilefoundation[J].Under-ground Space Use:Analysis of the Past and Lessons in the Future.London:Taylor and Francis Group,2005(1):141-147.
[19] Chen L T,Poulos H G,Loganath an N.Pile responses cau sed by tunneling[J].Journal of Geotechnical and Geoenvironmental Engineering,ASCE,1999,125(3):207-215.
[20] 张汎,刘军,萧岩,王光明.隧道施工引起地层位移对桥梁桩基的影响分析[J].市政技术,2005(z1):86-89.
[21] 芮勇勤,岳中琦,唐春安,杨天鸿,陆培炎.隧道开挖方式对建筑物桩基影响的数值模拟分析[J].岩石力学与工程学报,2003,22(5):735-741.
[22] 李建旺.隧道掘进时穿越群桩的变形控制技术[J].市政技术,2008(1):12-15.
[23] 张志强,何川.深圳地铁隧道邻接桩基施工力学行为研究[J].岩土工程学报,2003,25(2):204-207.
[24] 宋卫东,王永清,马鹏姣,杜建华,张继清.北京地铁五号线近接玉蜒桥施工的力学行为研究[J].北京科技大学学报.2007,29(3):251-255.
[25] 苏洁,张顶立.北京地铁浅埋暗挖施工对既有桥桩的影响分析[J].岩土力学,2006,27(2):477-482.
[26] 何海健,项彦勇,刘维宁,周书明.地铁车站隧道群施工对邻近桥桩影响的数值分析[J].北京交通大学学报,2006,30(4):54-59.
[27] 何海健,项彦勇,刘维宁.地铁施工引起邻近桥梁桩基差异沉降的概率分析[J].岩石力学与工程学报,2007(21):3257-3265.
[28] 吴波,刘维宁,索晓明,史玉新.地铁施工近邻桥基加固效果三维数值分析[J].铁道工程学报,2005(5):48-52.
[29] 吴波.地铁隧道过河过桥施工技术研究[J].铁道工程学报,2008(5):76-79.
[30] 姚宣德,王梦恕.地铁浅埋暗挖法施工引起的地表沉降控制标准的统计分析[J].岩石力学与工程学报,2006,25(10):2030-2035.

相似文献/References:

[1]杨昀,曹丽英.地铁火灾场景设计探讨[J].自然灾害学报,2006,(04):121.
 YANG Yun,CAO Li-ying.Preparatory study on scenario design for subway fire[J].,2006,(03):121.
[2]闫静雅,王如路.上海软土地铁隧道沉降及横向收敛变形的原因分析及典型特征[J].自然灾害学报,2018,(04):178.[doi:10.13577/j.jnd.2018.0424]
 YAN Jingya,WANG Rulu.Cause analysis and typical characteristics of settlement and transverse convergence deformation of metro tunnel in soft ground in Shanghai[J].,2018,(03):178.[doi:10.13577/j.jnd.2018.0424]

备注/Memo

备注/Memo:
收稿日期:2008-10-26;改回日期:2009-3-16。
作者简介:吴朝阳(1983-),男,博士研究生,主要从事地铁临近建筑和桥梁施工研究.E-mail:sun4652@sina.com
通讯作者:李正农,男,教授Email:zhn88@263.net
更新日期/Last Update: 1900-01-01