[1]王熠琛,郑宏,张明聚.地铁施工风险分析方法的研究现状与展望[J].自然灾害学报,2018,(04):075-80.[doi:10.13577/j.jnd.2018.0410]
 WANG Yichen,ZHENG Hong,ZHANG Mingju.State and outlook for risk analysis method of subway construction[J].,2018,(04):075-80.[doi:10.13577/j.jnd.2018.0410]
点击复制

地铁施工风险分析方法的研究现状与展望
分享到:

《自然灾害学报》[ISSN:/CN:23-1324/X]

卷:
期数:
2018年04期
页码:
075-80
栏目:
出版日期:
2018-09-28

文章信息/Info

Title:
State and outlook for risk analysis method of subway construction
作者:
王熠琛1 郑宏12 张明聚1
1. 北京工业大学 建筑工程学院, 北京 100124;
2. 中国科学院武汉岩土力学研究所, 湖北 武汉 430071
Author(s):
WANG Yichen1 ZHENG Hong12 ZHANG Mingju1
1. College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100124, China;
2. Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China
关键词:
工程风险风险分析经验分析物理分析风险损失等级
Keywords:
engineering riskrisk analysisempirical analysisphysical analysisrisk loss level
分类号:
U231;C931.5;X9
DOI:
10.13577/j.jnd.2018.0410
摘要:
从风险思想的起源与发展出发明确出工程风险的概念,并结合地铁工程本身论述地铁施工风险的本质与特点。在此基础上对地铁施工风险分析的研究现状进行了总结,所存在的主要问题包括:(1)风险分析概念界定的模糊性;(2)风险损失分析的研究不充分;(3)对风险演化过程的结合不紧密;(4)对已有技术成果的利用不充分。针对风险分析所存在问题提出了展望,地铁施工风险分析方法应该由经验分析为主转变为物理分析与经验分析相结合,包括:(1)明确风险分析的基本概念;(2)进行科学的风险损失等级评价;(3)结合风险演化的物理过程;(4)集成利用已有的技术成果。
Abstract:
The concept of engineering risk was defined based on the origin and development of risk idea, and the essence and characteristics of risk for subway construction were discussed combining with subway engineering. Based on these the disadvantages of actual risk analysis for subway construction were put forward:(1)The ambiguous definition about risk analysis concept; (2)Deficient study for risk loss; (3)Progress of risk evolution is not combined closely; (4)Existing techniques is not applied fully. Therefore the outlook had been put forward, the risk analysis method for subway construction should be changed from empirical analysis to combination of physical and empirical analysis, that:(1)Risk analysis concept should be defined explicitly; (2)Risk loss level should be estimated reasonably; (3)Physical progress of risk evolution should be combined; (4)Technical achievements should be applied integrated.

参考文献/References:

[1] 钱七虎, 戎晓力. 中国地下工程安全风险管理的现状、问题及相关建议[J]. 岩石力学与工程学报, 2008, 27(4):649-655. QIAN Qihu, RONG Xiaoli. State,Issues and relevant recommen dations for security risk management of China’s underground engineering[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(4):649-655. (in Chinese)
[2] KI-CHANG H, MIN S, CHOI H, et al. Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels[J]. Tunnelling and Underground Space Technology, 2015(49):121-129.
[3] GAO Yunhao, DU Xiuli, ZHANG Mingju. The application of dynamic priority of AHP on operation risk assessment of metro. Modeling Risk Management in Sustainable Construction[M]. Berlin:Berlin Heidelberg, 2010:65-72.
[4] 赵延喜, 徐卫亚. 基于AHP和模糊综合评判的TBM施工风险评估[J]. 岩土力学, 2009, 30(3):793-798. ZHAO Yanxi, XU Weiya. Risk assessment of TBM construction for tunnels based on AHP and fuzzy synthetic evaluation[J]. Rock and Soil Mechanics, 2009, 30(3):793-798. (in Chinese)
[5] 闫玉茹, 黄宏伟, 胡群芳, 等. 大连湾海底隧道钻爆法施工风险评估研究[J]. 岩石力学与工程学报, 2007, 26(s2):3616-3624. YAN Yuru, HUANG Hongwei, HU Qunfang, et al. Risk assessment on drill and blasting method of DALIAN bay subsea tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(s2):3616-3624. (in Chinese)
[6] 杜修力, 高云昊, 张明聚, 等. 网络分析法及其在地下工程风险分析中的应用[J]. 土木工程学报, 2010, 43(S2):353-357. DU Xiuli, GAO Yunhao, ZHANG Mingju, et al. Analytic network process and its application in risk assessment in under ground engineering[J]. China Civil Engineering Journal, 2010, 43(S2):353-357. (in Chinese)
[7] Sousa Rita L, Einstein Herbert H. Risk analysis during tunnel construction using Bayesian Networks:Porto Metro case study[J]. Tunnelling and Underground Space Technology, 2012, 27(1):86-100.
[8] QIAN Fang, Dingli Zhang, Louis Ngai Yuen Wong. Environmental risk management for a cross interchange subway station construction in China[J]. Tunnelling and Underground Space Technology, 2011, 26(6):750-763.
[9] PCLARKE J, LAEFER D. Evaluation of risk assessment procedures for buildings adjacent to tunnelling works[J]. Tunnelling and Underground Space Technology, 2014, 40(1):333-342.
[10] 任旭. 工程风险管理[M]. 北京:清华大学出版社, 2010:1-2. REN Xu. Engineering Risk Management[M]. Beijing:Tsinghua University Press, 2010:1-2. (in Chinese)
[11] 余建星. 工程项目风险管理[M]. 天津:天津大学出版社, 2006:1. YU Jianxing. Engineering Project Risk Management[M]. Tianjin:Tianjin University Press, 2006:1. (in Chinese)
[12] 陶履彬, 李永盛, 冯紫良, 等. 工程风险分析理论与实践-上海崇明越江通道工程风险分析[M]. 上海:同济大学出版社, 2006:1-2. TAO Lvbin, LI Yongsheng, FENG Ziliang, et al. Engineering Risk Analysis——Theory and Practice of Shanghai Chongming River crossing Engineering Risk Analysis[M]. Shanghai:Tongji University Press, 2006:1-2. (in Chinese)
[13] 黄宏伟, 陈龙, 胡群芳, 等. 隧道及地下工程的全寿命风险管理[M]. 北京:科学出版社, 2010:44. HUANG Hongwei, CHEN Long, HU Qunfang, et al. Life-cycle Risk Management for Tunnel and Underground Engineering[M]. Beijing:Science Press, 2010:44. (in Chinese)
[14] 张顶立. 城市地下工程建设安全风险及其控制[M]. 北京:化学工业出版社, 2012:23. ZHANG Dingli. Safety Risks and Corresponding Control Measures of Urban Underground Engineering Construction[M]. Beijing:Chemical Industry Press, 2012:23. (in Chinese)
[15] 徐波. 城市防灾减灾规划研究[D]. 上海:同济大学, 2007. XU Bo. City Disaster Prevention and Reduction Plan Research[D]. ShangHai:Tongji University, 2007. (in Chinese)
[16] H H Einstein, G S Vick.Geological model for tunnel cost model[J]. Proc Rapid Excavation and Tunneling Conf, 2nd, 1974:1701-1720.
[17] Eun-Soo Hong, In-Mo Lee, Hee-Soon Shin, et al. Quantitative risk evaluation based on event tree analysis technique:Application to the design of shield TBM[J]. Tunnelling and Underground Space Technology, 2009, 24(3):269- 277.
[18] 杜修力, 张雪峰, 张明聚, 等. 基于证据理论的深基坑工程施工风险综合评价[J]. 岩土工程学报, 2014, 36(1):155-161. DU Xiuli, ZHANG Xuefeng, ZHANG Mingju, et al.Risk synthetic assessment for deep pit construction based on evidence theory[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(1):155-161. (in Chinese)
[19] 周红波, 高文杰, 蔡来炳, 等. 基于WBS-RBS的地铁基坑故障树风险识别与分析[J]. 岩土力学, 2009, 30(9):2703- 2707, 2726. ZHOU Hongbo, GAO Wenjie, CAI Laibing, et al. Risk identification and analysis of subway foundation pit by using fault tree analysis method based on WBS-RBS[J]. Rock and Soil Mechanics, 2009, 30(9):2703-2707, 2726. (in Chinese)
[20] 金淮, 吕培印, 徐耀德. 地铁初步设计地下工程安全风险评估研究[J]. 都市快轨交通, 2012, 25(5):42-47. JIN Huai, LV Peiyin, XU Yaode. Research on pisk assessment of underground works in preliminary design for subways[J]. Urban Rapid Rail Transit, 2012, 25(5):42-47. (in Chinese)
[21] 金淮, 张成满, 马雪梅, 等. 城市轨道交通安全风险技术管理体系的建立[J]. 都市快轨交通, 2010, 23(1):34-37. JIN Huai, ZHANG Chengman, MA Xuemei, et al. Urban rail transit risk management system establishment[J]. Urban Rapid Rail Transit, 2010, 23(1):34-37. (in Chinese)
[22] 胡群芳, 刘爽, 黄宏伟. 盾构隧道施工风险数据库系统设计与开发研究[J]. 地下空间与工程学报, 2012, 8(s2):1656-1659, 1664. HU Qunfang, LIU Shuang, HUANG Hongwei. A risk events database system for shield tunneling construction[J]. Chinese Journal of Under ground Space and Engineering, 2012, 8(s2):1656-1659, 1664. (in Chinese)
[23] 丁烈云, 周诚. 复杂环境下地铁施工安全风险自动识别与预警研究[J]. 中国工程科学, 2012, 14(12):85-93. DING Lieyun, ZHOU Cheng. Automatic risk identification and safety early-warning of underground construction under complex conditions[J]. Chinese Engineering Sciences, 2012, 14(12):85-93. (in Chinese)
[24] 黄宏伟, 朱琳, 谢雄耀. 上海地铁11号线关键节点工可阶段工程风险评估[J]. 岩土工程学报, 2007, 29(7):1103-1107. HUANG Hongwei, ZHU Lin, XIE Xiongyao. Risk assessment on engineering feasibility of key events in Shanghai metro line No. 11[J]. Chinese Journal of Geo-technical Engineering, 2007, 29(7):1103-1107. (in Chinese)
[25] 苏洁, 张顶立, 周正宇, 等. 地铁隧道穿越既有桥梁安全风险评估及控制[J]. 岩石力学与工程学报, 2015, 34(S1):3188-3195. SU Jie, ZHANG Dingli, ZHOU Zhengyu, et al. Safety risk assess ment and control of existing bridge crossed by tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2015, 34(S1):3188-3195. (in Chinese)

相似文献/References:

[1]赵思健,黄崇福,郭树军.情景驱动的区域自然灾害风险分析[J].自然灾害学报,2012,(01):009.
 ZHAO Sijian,HUANG Chongfu,GUO Shujun.Scenario-driven risk analysis of regional natural disasters[J].,2012,(04):009.
[2]乐丛欢,丁红岩,董国海,等.基于模糊故障树的海洋立管破坏失效风险分析[J].自然灾害学报,2012,(02):173.
 LE Conghuan,DING Hongyan,DONG Guohai,et al.Risk analysis of failure damage to marine riser based on fuzzy fault tree[J].,2012,(04):173.
[3]毛德华,谢石,刘晓群,等.洪灾风险分析的国内外研究现状及展望(Ⅲ)——研究展望[J].自然灾害学报,2012,(05):008.
 MAO Dehua,XIE Shi,LIU Xiaoqun,et al.Review and prospect of research on flooding risk analysis at home and abroad(Ⅲ): research prospect[J].,2012,(04):008.
[4]娄伟平,陈海燕,吴睿.基于灰色-模糊理论的农业旱灾风险分析[J].自然灾害学报,2011,(04):090.
 LOU Wei-ping,CHEN Hai-yan,WU Rui.Risk analysis of agricultural drought disaster based on grey-fuzzy theory[J].,2011,(04):090.
[5]黄崇福.风险分析基本方法探讨[J].自然灾害学报,2011,(05):001.
 HUANG Chong-fu.Discussion on basic methods for risk analysis[J].,2011,(04):001.
[6]孙阿丽,石勇,石纯.上海市水灾风险分析[J].自然灾害学报,2011,(06):094.
 SUN A-li,SHI Yong,SHI Chun.Risk analysis of flood disaster in Shanghai Municipality[J].,2011,(04):094.
[7]冯民权,郝竹林,张园园,等.禹门口调水工程水源区与受水区径流丰枯遭遇风险分析研究[J].自然灾害学报,2012,(06):156.
 FENG Minquan,HAO Zhulin,ZHANG Yuanyuan,et al.Risk analysis of runoff rich-poor encounter between water source area and receiving area of Yumenkou water transfer project[J].,2012,(04):156.
[8]魏瑞江,李春强,康西言.河北省日光温室低温寡照灾害风险分析[J].自然灾害学报,2008,(03):056.
 WEI Rui-jiang,LI Chun-qiang,KANG Xi-yan.Hazard risk analysis of low temperature and few sunshine for sunshine greenhouse in Hebei Province[J].,2008,(04):056.
[9]毛德华,何梓霖,贺新光,等.洪灾风险分析的国内外研究现状与展望(Ⅰ)——洪水为害风险分析研究现状[J].自然灾害学报,2009,(01):139.
 MAO De-hua,HE Zi-lin,HE Xi-guang,et al.Review and prospect of research on flood risk analysis at home and abroad(Ⅰ): status quo of research on risk analysis of flood hazard[J].,2009,(04):139.
[10]刘茂,刘斐.城市燃气管线风险评估[J].自然灾害学报,2009,(04):084.
 LIU Mao,LIU Fei.Risk assessment of urban gas pipeline[J].,2009,(04):084.

备注/Memo

备注/Memo:
收稿日期:2018-05-01;改回日期:2018-05-27。
基金项目:国家自然科学基金重点项目(51538001)
作者简介:王熠琛(1989-),男,博士研究生,主要从事地铁工程风险管理方面的研究.E-mail:bp19890327@163.com
通讯作者:郑宏(1964-),男,教授,博士,主要从事计算岩土力学,地铁风险动态管控的研究.E-mail:hzheng@whrsm.ac.cn