[1]关美荣,张浩森,李昀阳,等.高铁隧道施工对文物建筑影响的评估方法研究[J].自然灾害学报,2018,(05):088-95.[doi:10.13577/j.jnd.2018.0511]
 GUAN Meirong,ZHANG Haosen,LI Yunyang,et al.Research on the evaluation method of heritage conservation during high-speed railway tunnel construction[J].,2018,(05):088-95.[doi:10.13577/j.jnd.2018.0511]
点击复制

高铁隧道施工对文物建筑影响的评估方法研究
分享到:

《自然灾害学报》[ISSN:/CN:23-1324/X]

卷:
期数:
2018年05期
页码:
088-95
栏目:
出版日期:
2018-10-28

文章信息/Info

Title:
Research on the evaluation method of heritage conservation during high-speed railway tunnel construction
作者:
关美荣1 张浩森2 李昀阳2 党博翔2
1. 北京建工建筑设计研究院, 北京 100044;
2. 北京建筑大学 土木与交通工程学院, 北京 100044
Author(s):
GUAN Meirong1 ZHANG Haosen2 LI Yunyang2 DANG Boxiang2
1. Beijing Jiangong Architectural Design and Research Institute, Beijing 100044, China;
2. School of Civil and Transportation Engineering, Beijing University of Civil Engineering and Architecture, Beijing 100044, China
关键词:
高铁隧道施工文物建筑沉降倾斜率评估方法
Keywords:
high-speed railtunnel constructionheritage buildingsettlementslopeevaluate method
分类号:
U25;X9
DOI:
10.13577/j.jnd.2018.0511
摘要:
高铁隧道施工普遍采用暗挖盾构法,高铁隧道遇到下穿文物建筑情况时,施工过程势必造成地表沉降,进而可能使文物建筑发生不均匀沉降,若文物建筑倾斜过大,就有破坏的危险。目前,针对高铁隧道施工对文物建筑影响的评估尚无明确统一的方法,本文结合实际工程,研究了高铁隧道施工对文物建筑影响的因素,将地表沉降值和文物建筑倾斜率作为评估指标,提出了一套适用于高铁隧道施工对文物建筑影响的有效评估方法,其中沉降值可以采用工程类比法分析确定,文物建筑倾斜率可以采用国家规范进行限定,为高铁隧道施工对文物建筑影响的评估提供了实用方法。
Abstract:
Shield method is commonly used in the construction of high-speed railway tunnel. When the tunnel though the heritages, the ground is bound to settle. Then it may cause the uneven settlement of cultural relics. If the slope of heritage is too big, there is the danger of destruction. At present, there is no clear and unified method to evaluate the impact of heritage conservation during the construction of high-speed railway tunnel.Combining with practical engineering, this paper show a suitable method which can evaluate this influence effectively.Inside engineering analogy method can be used to analyze and determine the settlement value;the slope of heritage can be qualified with national standard. That is practical method for assessing.

参考文献/References:

[1] 陈春来, 赵城丽, 魏纲, 等. 基于Peck公式的双线盾构引起的土体沉降预测析[J]. 岩土力学, 2014, 35(8):2212-2218. CHEN Chunlai, ZHAO Chenli, WEI Gang, et al. Prediction of soil settlement induced by double-line shield tunnel based on Peck formula[J]. Rock and Soil Mechanics, 2014, 35(8):2212-2218. (in Chinese)
[2] 韩磊, 叶冠林, 王建华, 等. 浅覆土大直径盾构穿越对河堤影响的有限元分析[J]. 岩土工程学报, 2015, 37(增刊1):125-128. HAN Lei, YE Guanlin, WANG Jianhua, et al. Finite element analysis of impact of under-crossing of large shallow shield tunnel on riverbank[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(S1):125-128. (in Chinese)
[3] 陈育民, 徐鼎平. FLAC/FLAC3D基础与工程实例[M]. 北京:中国水利水电出版社, 2011:170-172. CHEN Yumin, XU Dingping. FLAC/FLAC3D Foundation and Engineering Examples[M]. Beijing:China Water & Power Press, 2011:170-172. (in Chinese)
[4] 李晓娇, 欧阳煜. 不同土质中隧道埋深对地表沉降的影响[J]. 佳木斯大学学报:自然科学版, 2015, 33(2):202-206. LI Xiaojiao, OUYANG Yu. Response of ground surface settlement due to tunnel depth in different soil[J]. Journal of Jiamusi University:Natural Science Edition, 2015, 33(2):202-206. (in Chinese)
[5] 蒋睿. 大直径软土盾构隧道工程地层沉降规律分析[J]. 中国市政工程, 2010(1):48-50. JIANG Rui. Rule analysis of stratum subsidence of large diameter & soft ground shield tunnel works[J]. China Municipal Engineering, 2010(1):48-50. (in Chinese)
[6] 黄平, 李林. 上海大直径盾构隧道施工引起地表沉降研究[J]. 公路工程, 2016, 41(5):156-160. HUANG Ping, LI Lin. Study on surface subsidence caused by the construction of large diameter shield tunnel in Shanghai[J]. Highway Engineering, 2016, 41(5):156-160. (in Chinese)
[7] GB50007-2011建筑地基基础设计规范[S]. 北京:中国建筑工业出版社, 2011. GB50007-2011 Code for Design of Building Foundation[S]. Beijing:Building Industry Press of China, 2011. (in Chinese)

相似文献/References:

[1]吴波,黄惟,王汪洋,等.基于PRA方法的上软下硬地层隧道施工风险评估研究[J].自然灾害学报,2018,(04):026.[doi:10.13577/j.jnd.2018.0404]
 WU Bo,HUANG Wei,WANG Wangyang,et al.Risk assessment of tunnel construction in upper-soft and lower-hard stratum based on PRA method[J].,2018,(05):026.[doi:10.13577/j.jnd.2018.0404]

备注/Memo

备注/Memo:
收稿日期:2018-03-02;改回日期:2018-06-11。
基金项目:北京市教委高层次人才引进项目(CIT&TCD20150101)
作者简介:关美荣(1984-),女,工程师,硕士,主要从事地下结构设计研究.E-mail:734660877@qq.com
通讯作者:张浩森(1992-),男,硕士研究生,主要从事地下结构设计研究.E-mail:410667444@qq.com
更新日期/Last Update: 1900-01-01